Service Guide
Hardware Installations and Upgrades
44 Intel® Workstation System SC5650SCWS Service Guide
Figure 37. Removing 5.25-inch Device Filler Panel from Front Bezel Assembly
8. Reinstall the front bezel assembly. For instructions, see “Installing the Front Bezel Assembly”.
9. Reinstall the left side cover. For instructions, see “Installing the Left Side Cover”.
10. Reconnect all peripheral devices and the AC power cable(s). Power up the Workstation.
Removing a DVD-ROM or CD-ROM Drive
1. Observe the safety and ESD precautions listed in Appendix A, “Safety Information”.
2. Power down the workstation and unplug all peripheral devices and the AC power cable.
3. Remove the chassis cover. For instructions, see “Removing the Left Side Cover”.
4. Remove the Front Bezel Assembly. For instructions, see “Removing the Front Bezel Assembly”.
5. Disconnect the power and data cables from the rear of the CD-ROM or DVD-ROM drive (see letter “F” in the
following figure). Move latch to the “unlock” position (see letter “D”). Slide CD-ROM or DVD-ROM drive out
of the Device Drive Bay (see letter “C”).