Quick Start Guide Back Page
Side 2
16
Install Rack
Mount Kit
(Optional)
If you intend to configure your server as
a pedestal system, disregard this step
and proceed to Step 17.
If you intend to configure your server as
a rack-mount system, go to the
instructions that came with your Rack
Mount Kit to complete your server
assembly.
15
Install Feet
1
2
Note: Repeat above steps until all four feet are installed.
Secure foot by inserting pin through the rubber foot.
Insert rubber foot into chassis hole.
1
2
Note: This step applies to the pedestal version only. If you plan
to configure your chassis as a rack mount system, go to Step 16.
10
Install Hot-Swap
Drive Cage Kit
(Optional)
If you intend to configure your
server with SATA/SAS hot swap
hard drives, go to the instructions
that came with your drive cage
upgrade kit to install the
drive cage and hot-swap drives.
9b
Install Tool-less Fixed Hard Drives
(If installing a hot-swap drive cage,
go to Step 10)
7
Install power and data cables to each
of the installed drives. The cables
route through the oval opening at
the bottom of the drive cage.
7
8
Re-attach drive cage EMI shield
to chassis.
9
Tighten thumb screw.
8
9
Accessories and Order Codes
6-Drive SAS/SATA Hot Swap Cage
without expander
6-Drive SAS/SATA Hot Swap Cage
with expander
Intel
®
Server Chassis Rack Mount Kit
I
Intel
®
Server System SC5650BCDP
Product Maintenance Kit
AXX6DRV3GR
1
AXX6DRV3GEXP
1
APP3RACKIT
APPTPMKIT
Hot Swap Conversion Kit
APPTHSDBKIT
1
Requires a Hot Swap Conversion Kit to integrate into the Intel
®
Server
System SC5650BCDP.
A complete list of accessories and spares can be found at:
http://support.intel.com
Document Type
Available Documents
Technical Product Specification
Spares and Configuration Guide
Software and Drivers
Content
In-depth technical information
Supported accessories and spares list
Up-to-date firmware, driver and
utility information
Additional Reference Documents available at: http://support.intel.com
18
Close System
2
1
1
Replace screws.
2
Slide the
side cover on
chassis and
latch securely.
CAUTION: This
chassis must be
operated with the
SIDE COVER
installed to ensure
proper cooling.
14
Remove Filler
Panels
Remove the bezel filler panels for each
drive you have installed. Release plastic
tabs located at back side of bezel and
pull out filler panels from front.
8
Install Tool-less CD-ROM or DVD-ROM Drive
1
2
3
2
1
Remove EMI shield from 5.25-inch device drive bay.
Make sure latch is in "unlock" position.
Line up holes in CD-ROM or DVD-ROM drive with
holes in chassis.
Connect power (P5 or P6) cables and data cables
to rear of the CD-ROM or DVD-ROM
Move latch to "lock" position.
Insert CD-ROM or DVD-ROM drive into device drive bay.
An additional 4-pin IDE male-to-SATA 15 pin power cable
adapter may be needed if the CD-ROM or DVD-ROM does
not have a 4-pin power connector.
6
5
4
Data cables are included with the Intel
®
Server Board.
3
5
4
6
Data
Power
17
Install Front Bezel Assembly
Engage three clips
at right edge of
chassis.
Rotate left side
of bezel assembly
toward chassis.
Snap two bezel tabs
into corresponding
recesses at left edge
of chassis front panel.
1
3
2
3
1
1
1
2
3
Chassis Features and Components
A. Front Panel
B. 5.25-inch Device
Drive Bays (2)
C. Hard Drive Cage
Access Door
D. Door Lock
E. USB Ports (2)
F. Fan Duct and
System Fan
(DP/WS/BRP
configuration
shown)
G. Hard Drive Cage
Retention
Mechanism
H. Alternate external
SCSI Knockout
I. Fixed Hard
Drive Fan
J.
SC5650BCDP Mother Board
K. Padlock Loop
L. PCI Card Guide
M. External SCSI
Knockout
N. Serial B port
Knockout
O. Power Supply
(fixed illustrated)
P. A/C Power In
Q. I/O Shield
R. PCI Add-in
Board Slots
H
J
K
M
N
O
P
R
Q
L
I
A
C
B
D
E
G
F
12
Install PCI Card Guide
1
Insert tabs on left side of PCI card guide into slots in chassis.
2
Swing PCI card guide into chassis until right-side blue tabs snap into place.
1
2
9a
Install Tool-less Fixed Hard Drives (If installing a hot-swap drive cage, go to Step 10) (Continued...)
Insert fixed drive cage into chassis.
1
1
2
Route power and data cables
through cable routing area at the
bottom of the fixed drive cage.
3
Pull the drive latch forward for the drive
bay you want to install a hard drive in.
Drive slots 1, 3, and 5 MUST be
populated first. Failure to do so
could result in thermal issues
within chassis.
3
1
2
4
3
5
6
4
Insert fixed hard drive into drive bay
until it stops. Ensure that the power
and data connector end of the hard drive
is facing forward.
4
5
Push drive latch in to lock hard drive
into drive bay.
Install additional drives as necessary.
6
5
Server Board S5500BC
Component Layout
See your Intel
®
Server
System S5500BCDP User's
Guide for expanded
component and
connection information.
ICH10
Note: Refer to the
Technical Product
Specification for
Diagnostic LED
decoder list.
Diagnostic LEDs
DIMM_A2
DIMM_A1
DIMM_B2
DIMM_B1
DIMM_E1
DIMM_E2
DIMM_D1
DIMM_D2
CPU 1 Socket
CPU 2 Socket
Slot 7 (PCI Express* x8)
Slot 6 (PCI Express* x8, Riser Card)
Slot 5 (PCI Express* x4)
Slot 4 (PCI 32/33)
RMM3
Slot 3 (PCI Express* x4)
NIC 2
USB 9
USB 8
NIC 1
USB 7
USB 6
VGA
Serial A
SYS FAN 3
SYS FAN 2
SATA 4
USB 2-3
USB 0-1
SATA 5
Serial B
HSBP_A
Main Power
CPU Power
BIT1
LSB
DIMM Fault
LEDs
Front Panel Header
CPU 1 FAN
SYS FAN 1 CPU 2 FAN
DIMM Fault LEDs
IOH
P/S AUX
SATA RAID
Key
Status LED
ID LED
BIT3
BIT2
BIT6
MSB
BIT4
BIT5
BMC
SATA 0
SATA 1
SATA 3
SATA 2
Battery
IPMB_1
SATA SGPIO
13
Install PCI Add-in Boards
While holding the PCI add-in
board by its top edge or upper
corners, firmly press the add-in
board into the expansion slot.
3
Close the back panel PCI add-in
board retention device.
4
4
From inside of chassis, press open
the back panel PCI add-in board
retention device.
1
1
Remove the PCI slot shield by
pressing the shield out from
the inside of the chassis.
2
2
3
Front Panel Controls
and Indicators
A. Power/Sleep
LED
B. Power/Sleep
Button
C. NMI Button
D. Reset Button
E. NIC 1 Activity
LED
F. NIC 2 Activity
LED
G. Hard Drive
Activity LED
H. Status LED
A
C
F
H
B
D
E
G
Reference
19
Finishing Up
1. See your Intel
®
Server Board
Quick Start User's Guide to
connect your keyboard,
mouse, video and other I/O
cables.
2. Connect the AC power
cable last.
CAUTION: Power supply
requires a 16-gauge
power cord.
20
Install Software
BIOS, Drivers, and Operating
System Install
A. Confirm BIOS Version:
Look on the
Server/System Management screen in the BIOS
Setup Utility to determine the installed BIOS
version.
Compare this to the versions at:
http://support.intel.com/support/motherboards/server/S5500BC/
If new versions are available, update the BIOS
on your server. See the User Guide on the
Intel
®
Server Deployment Toolkit CD for
update instructions.
B. Configure your RAID Controller:
Use the instructions provided with the
RAID controller.
C. Install your Operating System:
Use the instructions provided with the RAID
controller and with the operating system.
D. Install Operating System Drivers:
With the operating system running, insert the
Intel
®
Server Deployment Toolkit CD. If using
a Microsoft* Windows*operating system,
the Express Installer will autorun and allow
you to select the appropriate drivers to install.
On other operating systems, browse the CD
folders to locate and install the driver files.
11
Complete Server
Board Connections
See your Intel
®
Server Board Quick Start
User's Guide or the User Guide for server
board cable connections.
Fan Connection
Fan Header Used Notes
System Fan 1 PCI Zone Chassis Fan
System Fan 2 HDD Cage Fan
System Fan 3 Rear Chassis Fan