Product Service Guide

Hardware Installations and Upgrades
60 Intel® Server System SC5650BCDP Service Guide
8. Rotate the blue locking mechanism to the locked position (see letter “A” in the
following figure).
Figure 66. Locking Fixed Power Supply into Chassis
9. Route and connect the P1, P2, P3 and P4, P1 to the server board. Refer to the Intel
®
Server Board Quick Start Users Guide or User Guide that came with your Intel
®
server board for appropriate power connections.
10. Route the P5 to the PCI Express* graphic cards.
11. Route the P9 and P10 to the 5.25-in. removable media device bays and connect to
installed devices.
12. Route the P11, P12, P13, and P14 (for DP/BRP/WS) cables to the hard drive cage and
connect power cables to installed devices.
13. Install the left side cover. For instructions, see “Installing the Left Side Cover”.
14. Reconnect all peripheral devices and the AC power cable to the server. Power up the
server.
TP01755
A