Service Guide
Hardware Installations and Upgrades
Intel
®
Server System P4000IP and Intel
®
Workstation System P4000CR Service Guide 17
2 Hardware Installations and Upgrades
Before You Begin
Before working with your server product, pay close attention to the Safety Information
This document provides instructions for adding and replacing chassis components. For
instructions on replacing components on the server board, such as the processor and memory
DIMMs, see the instructions provided with the server/workstation board.
Tools and Supplies Needed
Phillips* (cross head) screwdriver (#1 bit and #2 bit)
Needle nosed pliers
Anti-static wrist strap and conductive foam pad (recommended)
System Reference
All references to left, right, front, top, and bottom assume the reader is facing the front of the
chassis as it would be positioned for normal operation.
Cable Routing Recommendations
When you add or remove components from your server system, make sure your cables are routed
correctly before reinstalling the server system cover. Use caution to make sure no cables or wires are
pinched and that the airflow from the fans is not blocked. Use the figures below to determine the correct
cable routing.
/
NOTE
To activate the port SATA/SAS 4-7 on the server board, a proper Intel
®
RAID C600 Upgrade Key must be
installed. For instructions, see Intel
®
RAID C600 Upgrade Key Installation Guide.