Service Guide
Hardware Installations and Upgrades
Intel
®
Server System P4000IP and Intel
®
Workstation System P4000CR Service Guide 63
1. Observe the safety and ESD precautions at the beginning of this book.
2. Power down the server and unplug all peripheral devices and the AC power cable.
3. Remove the chassis cover. For instructions, see “Removing the Chassis Cover”.
4. Remove the front bezel if it is installed. For instructions, see “Removing the Front Bezel (Pedestal Only)”.
5. Install bottom 8x2.5” Hot-Swap Hard Drive Cage.
6. Slide the 8x2.5” Hot-Swap Drive Cage into the slot (see letter A).
7. Secure the Hard Drive Cage with the Screw (see letter B).
Figure 78. Installing the Top 8x2.5” Hot-swap Hard Drive Cage Assembly
8. Make the backplane and server board/RAID controller card cable connections. Refer to the documentation
that came with your server board and/or RAID controller card for instructions on connecting backplane
cables to your server board or RAID controller card.
i. Connect an I
2
C cable to the I
2
C _IN connector of the bottom backplane (see letter A).
ii. Connect MiniSAS data cables to the Mini SAS connector of the backplane (see letter B).
iii. Connect power cable to the power connector (see letter C).