Service Guide
Hardware Installations and Upgrades
Intel
®
Server System P4000IP and Intel
®
Workstation System P4000CR Service Guide 49
Figure 62. Removing the 2.5” HDD from Fixed HDD tray
9. Reinstall the HDD carrier tray into chassis.
Figure 63. Reinstalling the HDD Carrier Tray
10. Install the Fixed HDD EMI shield. For instructions, see “Installing the Fixed HDD EMI Shield”.
11. Install the front bezel. For instructions, see “Installing the Front Bezel”.
12. Install the air duct if the air duct is removed. For instructions, see the Quick Start User’s Guide or
Service Guide provided with your Intel
®
server/workstation board.
13. Install the chassis cover. For instructions, see “Installing the Chassis Cover”.
14. Plug all peripheral devices and the AC power cable into the server.
15. Power up the server.