Hardware Installations and Upgrades
Intel
®
Server System R2000GZ/GL Service Guide 47
- If no power supply is to be installed, install the filler panel into the power supply cage.
Figure 77. Installing the filler panel
Installing and Removing the Server Board
Removing the Server Board
1. Disconnect all cables from the server board.
2. Remove the four screws to release the air duct side wall (see letter “A”).
3. Lift the air duct side wall straight up to remove from the server board (see letter “B”).
Figure 78. Removing the Air Duct Side Wall
4. Remove the nine screws from the server board (see letter “C”).
5. Lift the server board from the server system (see letter “D”).