System Service Guide

Hardware Installations and Upgrades
12 Intel
®
Server System R1000JP Family Service Guide
2 Hardware Installations and Upgrades
Before You Begin
Before working with your server product, pay close attention to the Safety Information on page iii
at the beginning of this manual.
Note: Whenever you service the system, you must first power down the server and unplug all peripheral
devices and the AC power cord.
Tools and Supplies Needed
Phillips* (cross head) screwdriver (#1 bit and #2 bit)
Needle nosed pliers
Anti-static wrist strap and conductive foam pad (recommended)
System Reference
All references to left, right, front, top, and bottom assume the reader is facing the front of the
chassis as it would be positioned for normal operation.
Note: The Intel
®
Server System R1000JP is shown for illustration purposes; server components with the
product family are identical.
Cable Routing
The Intel
®
Server System R1000JP family is a high density system. There are a few cables for
chassis internal routing.