Datasheet
Case Temperature Reference Metrology 
Thermal and Mechanical Design Guidelines     95 
Figure 7-22. Third Tape Installation 
12. Place a 3
rd
 piece of tape at the end of the step in the groove as shown in  
Figure 7-22. This tape will create a solder dam to prevent solder from flowing into 
the larger IHS groove section during the melting process. 
13. Measure resistance from thermocouple end wires (hold both wires to a DMM 
probe) to the IHS surface. This should be the same value as measured during the 
thermocouple conditioning Section D.5.1.step 3 (Figure 7-23). 
Figure 7-23. Measuring Resistance between Thermocouple and IHS 