Laptop User Manual
Dual-Core Intel
®
Xeon
®
processor LV with Intel
®
E7520 Chipset and Intel
®
6300ESB ICH
April 2007 User’s Manual
Order Number: 311274-009 57
Dual-Core Intel Xeon processor LV / E7520 Chipset / 6300ESB ICH
8.0 Debug Procedure
The debug procedure in this section is used to determine baseline functionality for the
Dual-Core Intel
®
Xeon
®
processor LV with Intel
®
E7520 Chipset and Intel
®
6300ESB
ICH Development Kit. This is a cursory set of tests designed to provide a level of
confidence in the platform operation.
8.1 Level 1 Debug (Port80/BIOS)
Refer to the steps in Table 23 when debugging a board that does not boot.
8.2 Level 2 Debug (Power Sequence)
Table 23. Level 1 Debug (Port80/BIOS)
Step Test Pass/Fail Criteria Cause of Failure
1 Verify “SYSTEM PWRGD” LED Green
Power sequence failure – go
immediately to Level 2 debug
2 Is “PCI Reset” LED illuminated?
Decimal on Port 80 display
RED
PCI reset stuck – go to Level 3 debug
3 Verify CPURST LED is off Off
CPU reset stuck – go to Level 3
debug
4 Verify Port 80 posting
Port 80 LEDs are posting
boot codes and stopping
System Hang – Check BIOS go to
level 3 debug. Refer to AMI* BIOS
documentation for details.
5 Verify BIOS settings Latest BIOS installed
Contact Intel representative for the
latest BIOS image
6 Verify default jumper settings See default settings Improper jumper settings
Table 24. Level 2 Debug (Power Sequence)
Step Test Pass/Fail Criteria Cause of Failure
1 Primary power supply voltages
Measure voltages across:
3.3V
-12V
5V
5V
12V
External power supply failure
2 1.8V 1.8V DDR2 power supply failure
3 1.5V 1.5V MCH/ICH core power supply failure
4 1.8V VSBY 1.8V DDR2 standby power supply failure
5 CPU VTT Power Supply 1.05V CPU_VTT power supply failure
6 CPU0 VRD 1.2V – 1.4V CPU0 VRD failure
7 CPU1 VRD 1.2V – 1.4V CPU1 VRD failure
8 Verify “SYSTEM PWRGD” LED Green Power sequence failure