Installation Guide
18 
STEP 9: ALL ROOF PANELS 
Components Needed 
  13” wide “W” roof panel (J) 
  #10 x 3/8” sheet metal screw 
  Preformed flashing (N) 
  Sealant tube & gun 
Tools Recommended 
FIRST: Slide new roof panel back into hanging 
channel and firmly into foam rubber gasket. 
Seal panel ends to foam rubber gasket. Align 
new roof panel on 12” mark before securing 
with #10 x 3/8” sheet metal screw in panel 
“valley” at front fascia. 
SECOND: Continue installing each 13” wide 
“W” roof panel securely and seal generously 
at seams. 
Repeat with remaining roof panels until 50% 
across roof panels are installed. 
Secure Post bottom brackets in next step then 
complete remaining roof panels. 
THIRD: Install preformed flashing into grove 
on hanging rail. Position over first and second 
panels. Bend tabs down so they fit snug on 
surface of roof panel. 
Screw flashing to peaks of roof panels using 
#10 x 3/8” sheet metal screws. Seal the top of 
screw heads. 
NOTE: Each panel must align on 12” mark from early steps before securing and moving to 
next panel installation. Overall patio cover width may require to secure and seal roof panels 
at varying steps due to access. 










