Installation Guide

TWV Series Patio Cover
Installation Guide
STEP 1-A: Preparing the Front Fascia & Hanging Channel
Lay the hanging channel and front fascia parallel and evenly on a flat, non-abrasive surface.
Make sure both the front fascia and hanging channel rails remain even as shown. Tape
both ends together.
Step 1-B: Preparing the Front Fascia & Hanging Channel
Hook tape on the end and make the first mark on the Front Fascia and Hanging Channel 12
3/8” from the end. Then move the measuring tape to that first mark and proceed to mark
every 12” with a pencil. These will be the CRITICAL center marks of the mated roof panels.
DO NOT CUT the Front Fascia or Hanging Channel.
For Patio Covers wider than 16, please refer to page 42 first.
9