Installation Guide

TWV Series Patio Cover
Installation Guide
Step 6-L&M: Running the Roof Panels & Pre-Formed Flashing
After you run 2 more Roof Panels, having 3 Roof Panels exposed, MAKE SURE THE MATED
ROOF PANEL SEAMS ARE IN LINE WITH THE 12” MARKS ON THE HANGING CHANNEL AND
FRONT FASCIA. Fasten the next 2 Roof Panels with 2 screws at each end. Run the next Pre-
Formed Flashing, repeating Steps-J&K. Be sure to caulk and fasten through both pieces of
Flashing where they overlap, then fasten the Flashing through every other notch. Run all the
Roof Panels and Pre-Formed Flashings.
29