Installation Guide
TWV Series Patio Cover
Installation Guide
Step 6-G,H&I: Running the Roof Panels & Pre-Formed Flashing
Install, mate and lock the 3
rd
Roof Panel. *Push the Roof Panel so the mated seam of the
2 Roof Panels is in line with the 12” marks on the Hanging Channel and Front Fascia. Fasten
the 3
rd
Roof Panel.
Step 6-G,H&I: Running the Roof Panels & Pre-Formed Flashing
Finish fastening the 1
st
and 2
nd
Roof Panels into the Hanging Channel as shown in Step 5-E using
a #10 x 3/8” SMS into the screw groove. The Roof Panels should have 2 screws at both ends.
27










