Installation Guide
TWV Series Patio Cover
Installation Guide
Step 6-D: Running the Roof Panels & Pre-Formed Flashing
*IT IS IMPORTANT TO align the CENTER OF THE SEAMS of the overlapped/mated roof panels
WITH THE 12” MARKS made on the Hanging Channel and Front Fascia from Step1-B before
fastening the Roof Panels.
Step 6-E&F: Running the Roof Panels & Pre-Formed Flashing
Slide the Roof Panel into the Hanging Channel foam and line up the holes with the screw groove
in the Hanging Channel. Only fasten the RIGHT HALF SIDE OF THE NEW ROOF PANEL using one
#10 x 3/8” SMS into the Hanging Channel screw groove and one #8 tek screw into the Front Fascia.
26










