Installation Guide

TWV Series Patio Cover
Installation Guide
Step 6A&B: Running the Roof Panels & Pre-Formed Flashing
Starting on the right end, get a new Roof Panel, FEMALE lock on the right side.
Let this panel overhang a few inches OVER and past the Front Fascia.
Step 6-C: Running the Roof Panels & Pre-Formed Flashing
Set the FEMALE lock on top of the MALE lock of the first Roof Panel. Raise both Roof Panels
Upward where they touch slightly to make a V shape, then slowly lock them together.
Slide the New Roof Panel into the Hanging Channel against the foam weather stripping.
25