Installation Guide

TWV Series Patio Cover
Installation Guide
Step 5-H: Setting the First Roof Panels
Take the second roof panel, got to the LEFT end of the Hanging Channel. Slide the Roof Panel
Iito the Hanging Channel against the foam with the “female” lock edge on the Right. Keep the
MALE edge even/flush to the Hanging Channel and Front Fascia on the LEFT end.
Step 5-H: Setting the First Roof Panels
The pre-punched holes in the Roof Panels should be lined up with the screw groove in the bottom
lip of the Hanging Channel. Use one #10 x 3/8” SMS to fasten the first section of the Roof Panel
to the Hanging Channel as show in Step 5-E.
23