Installation Guide
TWV Series Patio Cover
Installation Guide
Step 5-F&G: Setting the First Roof Panels
Fasten the first section ONLY of the Roof Panel to the Front Fascia using one #8 tek screw.
Have the Roof Panel FLUSH with the top lip of the front of the Front Fascia, leaving a 1” space
from the Front Fascia. Use 4ft. Level to plumb/level the bottom of the end post in both directions
(front and side). DO NOT anchor the post bottom yet.
NOTE: The roof panel ends in line with the top lip of the Front Fascia.
22










