Installation Guide

TWV Series Patio Cover
Installation Guide
Step 5-C&D: Setting the First Roof Panels
Make sure the Right end of the Front Fascia is square to the right end of the Hanging Channel
at the house. Slide the Roof Panel into the Hanging Channel against the foam with the “female”
lock edge on the Right. Keep the panel flush/even to the Hanging Channel on the Right end and
Front Fascia.
Step 5-E: Setting the First Roof Panels
The pre-punched holes in the roof panels should be lined up with the screw groove in the bottom
lip of the Hanging Channel. Use one #10 x 3/8” SMS to fasten the first section of the roof panel
to the Hanging Channel as shown. DO NOT fasten the second section of the Roof Panel yet.
21