Installation Guide

THE FORCE
/
2
Set-Up and Operation, Cont.
14
L
OADING THE HOPPER:
Machine may be β€œon or off ” while loading.
Cellulose, place the bag of insulation material on the hopper. Use a knife to
open the bag so that the material falls into the hopper. Your FORCE/2 is designed
to self-feed.
Fiberglass, place the bag on the side of the hopper. Cut the bag in
thirds and dispense one third of the contents gradually until the agitator breaks up
and conditions the material. Load the remainder of the material according to the
distribution rate. Empty no more than
1
⁄3 bag at a time into the hopper, waiting
until at least
1
⁄4 of the material has been used before adding additional insulation.
Forcing insulation material will cause overloading, electrical
failure or possible machine damage.
If the agitator stops or the circuit breaker on the electrical panel trips, unplug the
machine from electrical power. Remove the cause of the jam from the hopper. You
may have to empty all the insulation material to locate and remove the jam. After
clearing, reset the circuit breaker, reconnect power and continue normal operation.
See page 22 for mor
e information on unjamming.
SET-UP AND OPERATION
Fiber
glass Insulation Only:
Cut as
sho
wn and br
eak bag int
o three sections