Datasheet

Commisioning INSYS GSM 4.2 LOGO!
24 Dezember 06
4 Commissioning
4.1 Installation Overview
4.1.1 Installation for Configuration
For initial commissioning and for configuration, the serial interface (RS 232) of the
INSYS GSM 4.2 LOGO! and the configuration PC are connected.
The supplied standard 9-pin cable with D-Sub 9 plug and socket connectors is
used as the cable for the RS 232.
4.1.2 Installation for Operation with Siemens LOGO!
For operation with LOGO!, the additional enclosed 9-pin INSYS adapter cable is
used.
The end of the cable with the fastening nuts is connected to the Siemens LOGO!
PC cable, the opposite end of which is inserted in the module card slot of LOGO!
The end of the cable with the fastening screws is connected to the D-Sub socket of
the INSYS GSM 4.2 LOGO!.
Note: Each time the PC and LOGO! connection is reestablished, the INSYS GSM
4.2 LOGO! should be restarted (Reset key pressed).