Installation Guide
Upscale Designs by EMA 
Polystyrene Mouldings Installation Guide 
Important: 
  Wear safety mask and goggles when cutting polystyrene 
mouldings. 
  Store moulding and adhesive in room temperature for at 
least 48 hours in order to avoid expansion or contraction. 
  Polystyrene mouldings can be glued, nailed or both. 
Tools: 
Measuring tape  Fine tooth saw Mitre saw  Pencil  Safety 
goggles  Safety mask  Hammer or finishing nailer  Putty knife  
Caulking gun  
Installation Instructions:  
Prepare the wall: Prior to installing mouldings ensure walls are 
clean, flat, dry, and free of grease or dust. 
Cut the panels: Cut quickly to avoid melting and achieving a 
clean cut. A blade with 60 teeth or more is recommended. Cut ¼” 
longer when filling a gap. 
If gluing the panels: 
  Apply a continuous ¼” bead of heavy duty construction 
adhesive along the back grooves or edges of the base 
moulding. 


