Installation Guide
Table Of Contents
2. Take a racheting socket wrench and device/ smartphone with the Inseego Mobile
App to the FW2010 location.
3. Use the Inseego Mobile App and the positioning bolts on the pole mount bracket
to fine tune the angle of the FW2010 for the best signal.
4. Tighten the positioning bolts to 15.0 Nm (11 ft/lb).
Orienting the device
1. Run the PoE cable to the desired location of the PoE injector and insert the cable
into the Data & Power Out port on the PoE power injector.
13