Inseego WavemakerTM 5G Outdoor CPE FW2010 Installation Guide PN 90029656 Rev 2
About the FW2010 Description The 5G Outdoor CPE FW2010 delivers multi-gigabit data rates over 5G millimeter wave networks using high power phased array antenna modules. The FW2010 provides extended range and coverage for millimeter wave cellular networks and delivers data connectivity to existing in-building networks. Durability The FW2010 has an environmental rating of IP67 for water and dust ingress and can operate within a temperature range of -30°C to 60°C (-22 to 140°F).
Pre-installation 1. Unscrew the protective shield over the SIM slots using a Phillips-head screwdriver. 2. Use the included SIM tool to insert a Nano 4FF SIM card into the appropriate SIM slot. Be careful to not use excessive force. NOTE: This device supports only Nano SIM cards. 3. Reattach the protective shield cover to a torque of 0.49 Nm (0.36 ft/lb), making sure the tether passes through the hole of the rear housing and is not bent or bunched.
. For ease of carrying during the location survey, attach the installation handle* to the back of the device with a Phillips-head screwdriver. 5. Install the PoE cable: NOTE: Make sure your PoE cable wiring is correct (see “PoE RJ45 fitting cable wiring diagram”). a. Unscrew the PoE gland cap assembly. b. Thread the PoE cable through the sealing cap, clip, and body of the gland assembly. Sealing cap Clip Body *Installation handle sold as an optional accessory.
c. Screw the body of the gland to the FW2010. d. Connect the two parts of the sealing around the cable, then slide the sealing into the gland body. Sealing e. Slide the clip and the sealing cap along the cable and screw the sealing cap tightly to the gland body. The sealing cap will keep the PoE connection secure and watertight. f. Insert the other end of the cable into the PoE injector Data & Power Out port. Plug the PoE injector into an earthed AC outlet.
Location survey 1. Scan the QR code to download the Inseego Mobile App from Apple Store or Google Play Store, or visit https://inseego.com/inseego-connect-getapp to download the App. 2. Follow instructions within the Inseego Mobile App to connect to the FW2010 and perform a 5G site survey to identify the ideal location to install.
Attaching the FW2010 to the device elevation bracket 1. Remove the installation handle and unplug the PoE cable from the PoE injector. 2. Attach a ground wire to the back of the device with the ground screw. M5 10mm ground screw / washer 3. Place the M6 external locking washers on the M6 21mm bracket mount bolts. M6 21mm bracket mount bolt and washer 4. Mount the device to the device elevation bracket using a hex driver to tighten the bolts to 2.0 Nm (1.48 ft/lb).
Securing the J-arm mount The J-arm mount is adjustable and can be mounted on vertical, horizontal, and slanted exterior surfaces. The mount is attached using the four roof mount lag screw in the corners of the base. Roof mount lag screw 1. Pre-drill holes in the surveyed location. 2. Attach the mount using a hex driver to tighten the lag screws. NOTE: Concrete anchors are provided if mounting to concrete or brick. Attaching the device to the J-arm mount 1.
Orienting the device 1. Run the PoE cable to the desired location of the PoE injector and insert the cable into the Data & Power Out port on the PoE power injector. 2. Take a racheting socket wrench and device/ smartphone with the Inseego Mobile App to the FW2010 location. 3. Use the Inseego Mobile App and the positioning bolts on the device elevation bracket and bottom of the mount to fine tune the horizontal and vertical angle of the FW2010 for the best signal. 4. Tighten the positioning bolts to 15.
Option #2: Pole Mount Installation Holes for M6 21mm bracket mount bolts and washers (4) External locking washer (4) Zenith bracket M10 carriage bolt (2) Washer (4) Hex flange head bolts with PEM nuts (4) M10 hex nut (4) U-bracket Azimuth bracket Assembling the pole mount bracket 1. Attach the azimuth bracket to the zenith bracket using the four hex flange head bolts and PEM nuts. 2.
Attaching the FW2010 to the pole mount bracket 1. Remove the installation handle and unplug the PoE cable from the PoE injector. 2. Attach a ground wire to the back of the device with the ground screw. M5 10mm ground screw / washer 3. Place the M6 external locking washers on the four M6 21mm bracket mount bolts. M6 21mm bracket mount bolt and washer 4. Attach the pole mount bracket to the FW2010 using a hex driver to tighten the bolts to 2.0 Nm (1.48 ft/lb).
Securing the device to the pole 1. Place the device against the pole. 2. Slide the U-bracket onto the M10 carriage bolts and secure with external locking washers, washers, and M10 hex nuts tightened to 4.0 Nm (2.95 ft/lb). Washer M10 hex nut External locking washer 3. Secure the ground wire to an appropriate earth ground.
Orienting the device 1. Run the PoE cable to the desired location of the PoE injector and insert the cable into the Data & Power Out port on the PoE power injector. 2. Take a racheting socket wrench and device/ smartphone with the Inseego Mobile App to the FW2010 location. 3. Use the Inseego Mobile App and the positioning bolts on the pole mount bracket to fine tune the angle of the FW2010 for the best signal. 4. Tighten the positioning bolts to 15.0 Nm (11 ft/lb).
Option #3: Wall Mount Installation Holes for M6 21mm bracket mount bolts and washers (4) Hex flange head bolts with PEM nuts azimuth to wall bracket (4) Wall bracket Zenith bracket Hex flange head bolts with PEM nuts zenith to azimuth bracket (4) Hole for hex flange lag bolts (4) Azimuth bracket Assembling the wall mount bracket 1. Attach the azimuth bracket to the zenith bracket using four flange head bolts and PEM nuts. 2.
Attaching the FW2010 to the wall mount bracket 1. Remove the installation handle and unplug the PoE cable from the PoE injector. 2. Attach a ground wire to the back of the device with the ground screw. M5 10mm ground screw / washer 3. Place M6 external locking washers on four M6 21mm bracket mount bolts. M6 21mm bracket mount bolt and washer 4. Attach the device to the wall mount bracket using a hex driver to tighten the bolts to 2.0 Nm (1.48 ft/lb).
Securing the device to the wall 1. Use four hex flange head lag bolts to attach the wall bracket to the wall. 2. Secure the ground wire to an appropriate earth ground.
Orienting the device 1. Run the PoE cable to the desired location of the PoE injector and insert the cable into the Data & Power Out port on the PoE power injector. 2. Take a racheting socket wrench and device/ smartphone with the Inseego Mobile App to the FW2010 location. 3. Use the Inseego Mobile App and the positioning bolts on the wall mount bracket to fine tune the horizontal and vertical angle of the FW2010 for the best signal. 4. Tighten both sets of positioning bolts to 15.0 Nm (11 ft/lb).
Testing the connection Checking the LED on the device The LED is located in the SIM compartment and is visible through the protective shield.
PoE RJ45 fitting cable wiring diagram The recommended PoE cable is Cat6A with T568B on both ends.
Important Information Inseego Mobile App requirements Smartphone or device on iOS 13 or above, or Android 9.0 or above. System requirements Any device with Ethernet capability and an Internet browser. The FW2010 is compatible with the latest major operating systems and versions of Web browsers. Approved firmware versions This device will only operate with firmware versions that have been approved for use by your service provider and the device manufacturer.