User's Manual

Installation Manual Alarm Output Devices 13-7
Mounting a SAP
3. A SAP only needs the use of 5 of these
wires for all but one zone. That zone
will be the one that provides power to
connector labeled P9 near the bottom of
the SAP circuit board.
To mount a SAP, use the following instructions:
1. Remove the front panel from its frame.
2. Using the SAP frame as a template,
mark the four mounting holes on the
mounting surface.
If you have locks or elevator deactivation, you
need to run a 2-conductor cable from the Fire
Panel Interface (FPI) for the fire alarm indicator.
3. Drill the mounting holes.
4. Secure the SAP frame to the mounting
surface using appropriate hardware and
replace the front panel.
Connecting a SAP to the Controller
NOTE:
On the 8-zone panel, P1 is for Zone 1, P2 is for
Zone 2 and so on.
Figure 13.8 Connecting a SAP to the Controller
To connect a SAP to the Controller, refer to
Figure 13.8 and use the following instructions:
Table 13.1 SAP Wire Color Code
Color Use for
RED +12v
(from one Controller only)
BLACK All Ground connections
BLUE All Supervise connections
WHITE All Alarm (Egress) connections
GREEN All Door Ajar connections
BROWN All Loiter connections
1. Run a separate 6-conductor unshielded
cable for each SAP that is connecting to
a Controller. The wire gauge will be
based upon the distance it will run (
see
page 2-4
).
2. For each zone, connect the appropriate
alarm outputs into their respective pins.
For consistency and ease of
troubleshooting use the color code
shown in Table 13.1.