Owner Manual
9
OZONE GENERATOR INSTALLATION
OZONE GENERATOR INSTALLATION - VS300 Spa Pack (continued...)
7. Connect the 6” end of the tubing to the barb on the injector and secure the Hartford loop into the insulation above the spa
cavity opening. (see fig. 1.6)
8. Drill a ¼” hole in the left edge 3” down from the corner. Drill a second hole 9-¼” below the first. Carefully replace the
insulation leaving enough space to mount the ozone generator. (see fig. 1.7)
9. Mount the ozone generator (see fig. 1.8). Connect the second end of the ozone tubing to the barb on the top of the ozone
generator. If needed, the tubing can be shortened.
10. Remove the cover of the spa pack. Unscrew the plastic that secures the wires on the right side. Insert and connect the
ozone cord to the circuit board. Resecure the cords and replace the cover. (see fig. 1.9)
11. Reinstall the manifold. Refill and start your spa. Ensure there is a slight bluish glow from the bottom of the ozone generator
and that a bubble mist is entering the water from the ozone jet. (see fig. 1.10)
figure 1.6 figure 1.7 figure 1.8 figure 1.9 figure 1.10