Reference Manual

NOTE:HEATER BODY
MUST BE FLUSH WITH
OR LOWER THAN THE
FINISHED CEILING.
SUB-FLOOR
1/2" CLEARANCE
FROM VENTILATION
HOLES
HEATER BODY FLUSH
w/ FINISHED CEILING
HEATER BODY FLUSH
w/FLANGE
BACKSIDE VIEW
5/8" TYPE X
DRYWALL CAP
5
Mounting Options
Applicable for Infratech’s W-Series and WD-Series 61-1/4" Heaters
W-61 Flush Mount Frame Installation Diagram
70.25
Installation Types
ACCESSIBLE JUNCTION
BOX MOUNTED OUTSIDE
OF SEALED POCKET
FIXTURE WHIP w/ CONNECTORS:
CONNECTION MADE AT HEATER
JUNCTION BOX
5/8" TYPE X DRYWALL SUBFLOOR
MIN. 2 X 8
ADJUSTABLE
“L” BRACKETS
WARNINGS:
• Do not use Surface Mount Brackets.
This Frame is ONLY to be used on a flat
non-sloped celling.
Heater Body must face straight down and be
flush with the finished ceiling.
Frame and Heater cannot be Installed on a
pitched angle.
Accessible Junction Box must be installed
outside of sealed drywall pocket.
Must use 5/8" type "X" drywall.
Must use supplied 4 foot Hi-Temp Fixture
Whip and Hi-Temp Ceramic Wire Nuts.
Please contact factory for longer length
Hi-Temp Fixture Whips available for purchase.
Discard Surface Mounting Brackets provided
with Heater and use “L” Brackets.
Use Licensed Electrician ONLY.
NOTES:
Heater suspends (Gravity) by resting on
adjustable “L” Brackets in flush mount fixture.
Mounting holes on Surface Flange to be
determined and drilled by Contractor/Installer.
Coil excess flex into heater cavity.
65.25
11.75
5/8" TYPE X DRYWALL
LINE AND SEAL ENTIRE CAVITY
(5 SIDES)