Specifications
Table Of Contents

Installation Instructions RPA Elite Series Projector Mount
9
1b
Concrete Installation
1. Determine mounting location.
WARNING: IMPROPER INSTALLATION CAN
RESULT IN SERIOUS PERSONAL INJURY OR
DAMAGE TO EQUIPMENT! Structural members
MUST be capable of supporting five times the
combined weight of all equipment being mounted.
2. Using the RPM as a guide, mark four mounting hole
locations on ceiling using a pencil or similar tool.
3. Drill four 3/8" (10mm) dia. pilot holes to a depth of
2-1/2" (64mm) deep.
4. Align four mounting holes in RPM with four pilot
holes.
IMPORTANT ! : Make sure mount is properly
oriented towards target before securing to
structure.
5. Install four Toggler A10 Alligator concrete anchors
(not included) by inserting into pilot holes and
pounding in until flush with mounting surface.
6. Secure RPM to structure using four 1/4" flat
washers and four 1/4" x 3" lag bolts. (not included)
Ø 10mm
(Ø 3/8”)
64mm
(2-1/2”)
(A)
3
X4
X4
1
2
5
X4
6
X (4)










