User's Manual

Table Of Contents
Chapter 4 - Commissioning
Technical User Manual
InfiLINK XG
41
4.1. Introduction
In order to initially setup an operational point-to-point link using InfiLINK XG units,
you must run the procedure described below.
4.2. Step by step procedure
Step 1 - Perform site survey
- Determine line of sight conditions and obstacles along the path
- Perform spectrum analysis and figure out spectrum occupation and
available channels
- Use InfiNet Wireless Link Planner tool
(
http://linkplanner.infinetwireless.com) to estimate link performance and
required configuration in terms of antennas, channel width, Tx power, etc.
Step 2 - Pre-configure the units in the lab
The equipment list required for lab configuration and on site installation is:
Component Description
2 x InfiLINK XG unit (ODU)
- Available in InfiLINK XG BOM
2 x mounting kit
- Available in InfiLINK XG BOM
2 x indoor power supply (IDU)
- Available in InfiLINK XG BOM