User's Manual
Table Of Contents
- FCC and IC Statement
- Getting started
- 1.1. Document structure
- 1.2. Abbreviations
- 1.3. Document marks
- System Description
- 2.1. Introducing InfiLINK XG
- 2.2. Hardware Description
- 2.3. InfiLINK XG Specifications
- Installation
- 3.1. Installation Requirements
- 3.2. Equipment Positioning Guidelines
- 3.3. Installing the Outdoor Units
- 3.4. Installing the Indoor Unit
- Commissioning
- 4.1. Introduction
- 4.2. Step by step procedure
- Operation & Administration
- 5.1. Introduction
- 5.2. InfiLINK XG unit access
- 5.3. Status
- 5.3.1. Interface Statistics
- 5.3.2. Wireless Link Statistics
- 5.4. Antenna alignment
- 5.5. Maintenance
- 5.5.1. Firmware
- 5.5.2. Upload
- 5.5.3. Download
- 5.5.4. Bottom section of the page
- 5.6. Settings
- 5.6.1. General
- 5.6.2. Network Access
- 5.6.3. Radio
- 5.6.4. Switch
- 5.6.5. VLAN Switching
- 5.6.6. SNMP
- 5.6.7. Apply and Try buttons for the configuration
- 5.6.8. Configuring QoS
- 5.6.9. Configuring per-VLAN 802.1p priority assignment
- Troubleshooting
- 5
- 6.1. Introduction
- 6.2. The wireless link is down (it got lost)
- 6.3. No access to the local unit
- 6.4. Expected capacity is not met
- 6.5. Errors on the wireless link, throughput fluctuations
- 6.6. No data is being transferred
- 6.7. The management of the unit is lost
- 6.7.1. ERConsole recovery procedure
- 6.7.2. Restore to factory settings using ERConsole
Chapter 1 - Getting Started
Technical User Manual
InfiLINK XG
2
1.1. Document structure
This document consists of the following chapters:
“Getting started” - This chapter presents the information about this document’s
purpose and structure
“System Description” - This chapter describes the hardware, accessories and
technical specifications of the InfiLINK XG unit
“Installation” - This chapter describes the steps to be taken when installing the
equipment at the installation sites and installation site requirements
“Commissioning” - This chapter presents the actions and operations required
for the initial setup of an operational point-to-point link using InfiLINK XG units
“Operation & Administration” - This chapter presents the functionalities of the
web interface, a simple and efficient way to monitor the device status,
configure and maintain the equipment
“Troubleshooting” - This chapter presents the actions to be followed when
investigating an occured problem
1.2. Abbreviations
The following abbreviations are used in this document:
AC - Alternating Current
AMC - Automatic Modulation Control
BOM - Bill of Materials
BS - Base Station
CPE - Customer Premises Equipment
DC - Direct Current
DHCP – Dynamic Host Configuration Protocol
ETH - Ethernet
FDD - Frequency Division Duplexing
GUI – Graphical User Interface
HTTP - Hyper Text Transfer Protocol
IDU - Indoor Unit
IGMP - Internet Group Multicast Protocol
LAN - Local Area Network