Operating Manual Instruction Manual

4 - 1
PN 074-519-P1C
3000 Micro GC Operating Manual
Chapter 4
Installation
4.1 Site Preparation
Before installation, make sure that the installation site is fully prepared. Contact
INFICON with any question regarding site preparation.
4.1.1 List of Required Tools
Adjustable wrench (small)
Adjustable wrench (large)
Two 7/16 in. open-ended wrenches
9/16 in. open-ended wrench
5/16 in. open-ended wrench
1/4 in. open-ended wrench
Tubing cutter
Teflo n
®
tape
4.1.2 Tubing and Fitting Requirements
Use pre-cleaned copper or stainless steel tubing, 1/8 in. OD, for carrier gas
connections between the tank regulator and 3000 Micro GC.
3000 Micro GC has a 1/8 in. Swagelok male carrier gas connection.
Pre-cleaned, GC grade copper tubing in 50 ft. lengths can be purchased
from various chromatography vendors. It is also included in the optional
Install Kit for Micro GC (PN G2860A).
Do not clean the tubing with a solvent prior to use.
Do not use Teflon or Tygon
®
tubing for the carrier gas.
Swagelok 1/8 in. nuts, front ferrules, and back ferrules.