Operating Manual Instruction Manual
7 - 52
PN 074-519-P1C
3000 Micro GC Operating Manual
7.15 Apply the Valco Valve Program to EZ IQ Method
7.15.1 Valco Valve Setup in EZ IQ
1 In EZ IQ, click Method >> Instrument Setup.
2 Click the Sampling tab. See Figure 7-68.
Figure 7-68 Instrument setup window - switching
3 Select the Valve purge position: from the drop-down list. This is the initial
valve position for purging before starting a single run in a sequence.
4 Type a Purge delay time:. This is the time defined for switching the valve to a
position which is specified in the Valve purge position after starting a run.
5 Save the method by clicking File >> Method >> Save.