Instruction Manual

Step : Insert junction box assembly thru ceiling cut-out.
Step : 4″ Unit: Attach junction box to threaded stud using wing
nut, securing assembly to housing ring.
6″ and 8″ Unit: Attach junction box to bracket using two (2) screws,
securing assembly to housing ring (as shown).
Step : Push LED housing thru housing ring.
Step : Align slotted holes (3) of housing with screw holes on hous-
ing ring and secure with 3 screws (supplied). Align edge of housing
flush with ceiling before tighten screws. Make sure screws are fully
engaged.
Step : Install trim, completing installation.
INSTALLATION INSTRUCTIONS
For VC/VW & BBD, LRM4, LRM6, LRM8
Install from Below
3 of 3
Technical Services Phone (888) 387-2212
1300 S. Wolf Road • Des Plaines, IL 60018 • Phone 800-323-5068 • Visit us at www.acuitybrands.com/Indy
©2017 Acuity Brands Lighting, Inc. Rev 1/18 065-1256
DISCONTINUED