Installation Manual

in-lite INSTALLATION MANUAL SMART BRIDGE
www.in-lite.com 01-12-2021
Installation step by step
The SMART BRIDGE is designed to be installed inside, preferably within 50 cm of
an ethernet router (connection point) to create a wired connection.
Installing the transformer
Step 1
Open the package of the SMART BRIDGE. Here you will find the screw for
mounting the transformer on its intended position. Mount the
product to a wall, panel or post using the screw supplied. See FIG. 1.
Step 2
Put the plug of the power adapter into the 110V/230V power socket. Put the
cable of this adapter into the connector on the bottom of the SMART BRIDGE.
The BRIDGE will be switched on automatically and this will be indicated with a
light on the front of the BRIDGE.
Step 3
Take the UTP-cable out of the package and connect one end to the SMART
BRIDGE. On the bottom side of it you will find the UTP-port to do this.
Step 4
Take the other end of the UTP-cable and connect it to an available port on the
ethernet router or a router connection point. The SMART BRIDGE will now try to
establish a network connection. A light on the front of the SMART BRIDGE will
signal if this has been done succesfully.
Step 5-6
Open the in-lite app and go to the settings menu where you can add a new
product. Go to “my gardens” and select the garden in which you want to add the
SMART BRIDGE. Then select the option “SMART BRIDGE” to add this product to
your garden (system).
Step 7-8
Follow the instructions in the in-lite app to perform the right settings for your
product.