User's Manual
9
3. After 30 minutes, remove the reector or softbox from the Bowens mount.
4. Use needle-nose pliers to carefully unhook the
retention spring wrapped around the top of the
ashtube. Make sure it’s disengaged from the ash
tube.
5. Once it’s unhooked, wear a pair of white cotton
gloves or hold a soft, dry cloth to grip the base of
the ashtube on each side, and carefully pull the
ashtube from the ash unit.
6. Push the pins of the new ashtube into the sockets,
using rm and even pressure at its base.
7. Use needle-nose pliers to fasten the retention
spring over the hook above the ashtube.
8. After the ashtube has been secured, replace the reector or softbox.
4
5