Product Manual

IMD LLC_____________________________________________________ 14
10011-12 04/15
Installing PTO shaft
If the guard for the power take-off shaft is not factory installed when the generator is
shipped:
The PTO shaft guard must be properly attached to the generator gearbox before the
generator is started up.
The PTO shaft end from the gearbox has a diameter of 1-3/8 inch and a 6-spline fitting
(6-spline drive shaft).
Push the PTO shaft onto the PTO shaft ends of the gearbox and tractor respectively,
and engage.
1 Generator PTO shaft end
2 Tractor PTO shaft end
PTO shaft joint angles
Keep generator PTO shaft end (1) and tractor PTO shafts (2) parallel as viewed from
above and from the sides of the shafts.
Maintain PTO shaft joint angles equal and as small as possible.
Checking the gearbox, oil level inspection
Be sure the gearbox is filled with the correct amount of gear oil before the generator is
used for the first time (see the “Maintenance section” for instructions).