Preparing for use - Delivery conditions
The power take-off generator is delivered fully assembled on a pallet.
Before using the generator for the first time, fill the gearbox with gear oil according to
specifications (see page 24) and fit the guard for the PTO shaft according to the
instructions of the PTO manufacturer.
Before lifting or moving the PTO generator, secure it safely against falling.
Do not stand immediately beside or beneath the suspended PTO generator.
Mounting onto a concrete slab
*Two spacing bars are included with your 10KW PTO generator. These must be mounted
underneath your generator to provide ground clearance for the PTO gearbox.
The PTO shaft which connects the tractor and the generator transmits torque to the
generator during normal operation.
Persons standing immediately beside the PTO generator may suffer serious personal
injuries unless the generator is securely mounted onto a concrete slab per instructions on
the following pages.
Serious damage may also be caused to the generator and the tractor, unless the generator is
properly installed and all other safety precautions and operating instructions have been
observed.
If the PTO is not mounted on a 3 point hitch or trailer: For safe operation the PTO
generator must be mounted onto a concrete slab with dimensions set forth in diagram
above.
Concrete slab construction
1. PTO generator mounting base (base
frame)
2. ½” masonry anchor bolt 8” long
3. Concrete slab
4. ½” thick rubber pad (will reduce
vibration)
5. ½” lock washer
6. ½” nut