Owner Manual
Shelving assembly should now be
complete & ready for use. Make sure
all shelving is leveled & the screws
are secured tightly with the allen key.
(See image to the right)
Step 9:
After placing complete shelving
unit securely on the ground, insert
all 4 post caps on top of each post.
Secure with a mallet, if necessary.
Step 8:
Mallet
THESE INSTRUCTIONS APPLY TO OUR SHELVING MODELS BELOW:
BL
Standard Duty
ES
Medium Duty
S
Heavy Duty
SX
Extra Heavy Duty
UP
Pot/Pan/Utility