Assembly Instruction
9
8
Now that the cabinet frames for your new
kitchen are in place, it’s time to install the
worktops and sink.
Step 5 includes:
• Measuring worktop lengths
• Making a corner seam
• Sawing the worktop
• Cutting a hole for the sink
• Sealing cut edges
• Installing the sink and the worktop
• Installing the kitchen mixer tap
You can read more about how to care for your solid
wood worktop in the Step 5 Poster.
Install
the worktop
The next step – after the cabinet frames, worktops
and sink are in place – is to add shelving, light-
ing, drawers and other accessories. All cabinet
frames have predrilled holes for quick and easy
installation of shelving, drawers and other interior
fittings. This also makes it simple to make adjust-
ments or add interior fittings later on.
Step 6 includes:
• Installing cover panels
• Installing lighting
• Putting shelves in place
• Installing and adjusting drawers
For complete details, follow the assembly instruc-
tions included in each package.
Install drawers,
shelves and lighting
5
6










