Installation guide
5.
Run
3
wires,
black,
white
and
green
(14
AWG),
in
¥2"
conduit
5.
Attach
M4
x
35
screws
to
secure
the
glass
hood.
from
service
panel
to
terminal
box.
6.
Use
UL
listed
wire
connectors
and
connect
black
wires
together.
7.
Use
UL
listed
wire
connectors
and
connect
white
wires
together.
ul
A.
M4
x
35
screws
6.
Install
vent
cover
by
placing
both vent
covers
on
the
hood.
7.
Secure
lower
vent
cover
to
hood
with
2
-2.9x
6.5
mm
Electrical
Shock
Hazard
screws,
one
on
either
side.
Electrically
ground
blower.
8.
Lift
upper
vent
cover
to
the
ceiling.
9.
Secure
upper
vent
cover
to
vent
cover
bracket
with
2
-
2.9
x
6.5
mm
screws.
Do
not
completely
tighten
the
lower
screws,
but
leave
a
clearance
of
about
6"
(2
mm).
Connect
ground
wire
to
green
and
yellow
ground
wire
in
terminal
box.
Failure
to
do
so
can
result
in
death
or
electrical
shock.
8.
Connect
ground
wire
to
green
and
yellow
ground
wire
in
terminal
box
using
UL
listed
wire
connectors.
9.
Replace
terminal
box
cover.
10.
Check
all
light
bulbs
to
make
sure they
are
secure
in
their
sockets.
11.
Reconnect
power.
2
Be
PO
oo
lip
60g
Eig
Si
gy
niet
yeu
gy
sity,
Uh
Complete
instatiation
1.
Check
lights
and
blower
operation.
See
“Range
Hood
Use”
section.
If
hood
does
not
operate:
m=
Check
that
the
circuit
breaker
is
not
tripped
or
the
household
fuse
has
not
blown.
m
Disconnect
power.
Check
that
wiring
is
correct.
2.
For
non-vented
(recirculating)
installations,
install
the
charcoal
filter.
See
“Install
Filters”
section.
3.
Place
the
2
L-brackets
onto
the
glass
hood.
me
A.
Vent
cover
bracket
B.
Upper
vent
cover
C.
Lower
vent
cover
D.2.9
x
6.5
mm
screws
10.
Apply
2
rubber
strips
on
the
inside
of
the
aesthetic
cover.
A.
L-bracket
4.
Slide
the
glass
hood
on
the
blower
housing.
A.
Rubber
strips
11.
Fit
over
the
glass
visor.
The
rubber
strips
will
work
to
protect
duct
covers
against
any
damage
when
fitting
the
cover.