User guide

33
Adapter
England
Adapter
Australia
Adapter
Europe, Switzerland
Fig. 7
Preparations
• Setting up
- Place the device on an even, stable, clean, nonslip, dry
and fireproof surface.
- Keep at least 20 cm of open space at the front and
rear side.
- When a plastic bath is used, please ensure that the heater
does not contact the bath.
- The place for installation should be large enough and
provide sucient air ventilation to ensure the room
does not warm up excessively because of the heat
from device radiates to the environment.
- Do not set up the device in the immediate vicinity of
heat sources and do not expose to sun light.
• Connecting the tubings
- Unscrew the union nuts and stoppers using a wrench
from the pump connection IN (8) and OUT (9).
- Connect the hoses for circulating the external system to
the pump connectors M 16 x 1 for IN and OUT directly
or with the olives.
- Screw the hose olive to the pump connection IN
and
OUT with union nuts. Slide the hoses (NW 12) onto the
olives. The hoses must be secured with suitable clamps .
Unpacking
• Unpacking
- Please unpack the device carefully
- In the case of any damage a detailed report must be
sent immediately (post, rail or forwarder).
Transport safety
- Remove the transport protection
under the buoyage (4). For HBC
device, you need to open the lid
(16) and remove the protection.
• Delivery scope
IC control, HBC control, HBC 10 control:
- IC control Immersion Circulator or HBC 5 control
or HBC 10 control Heating Bath Circulator with the
Wireless Controller (WiCo) according to the order
- Mains cable H 12
-
Hose olive NW 12 (2 pieces)
see Fig. 5
- Screwdriver (use for safety circuit) see Fig. 6
- WiCo holder WH10
- OS 1.0 power supply
(for WiCo)
see Fig. 7
- USB cable Micro A – Micro B 2.0
- USB cabel A – Micro B 2.0
- Operating instructions
- A warranty card.
Additional for HBC 5 control and HBC 10 control:
- Temperature sensor Pt 100.30.
Fig. 6Fig. 5
CAUTION
Adapter
USA, China
Stopper
Union nut
Fig. 8