Technical Manual
IDS Ingegneria Dei Sistemi S.p.A.
N doc:MN/2011/004 - Rev. 1.1
14 / 19
Tutte le informazioni sono di proprietà IDS. Tutti i diritti riservati.
All information contained in this document is property of IDS. All rights reserved
2. PROCEDURE OF ASSEMBLING
Here below you find the steps to assemble the Hi-Pave GPR system. Of course it’s
necessary to get a vehicle provided with a hook on the back side and possibly a carrier or
similar on the roof/back of the vehicle itself. Please follow the steps in order one by one.
1. Take the metal key (provided with the system) and unscrew the screw on the
vertical frame (see Errore. L'origine riferimento non è stata trovata.), until the
frame fits on to the hook of the vehicle. Then screw it again strongly keeping the
frame vertical as much as possible (Fig. 2-1).
Fig. 2-1 – Screw on the vertical frame
2. Make slide the horizontal frame (B) on the vertical frame (A), and fix B to A
applying 4 screws M8x20, attaching them to the 4 brackets and verify that the B
is horizontal and parallel as much as possible to the ground surface (see Fig. 2-2
and Fig. 2-3).
Fig. 2-2 – Horizontal frame attached to Vertical frame
HOOK
SCREW
VERTICAL
FRAME (A)
HORIZONTAL
FRAME (B)