User's Manual

AM201 Ver. 1.0 User Manual
Mod: MDM/011/M2 Rev 6
IDS GeoRadar Srl User Manual MNG/2022/011 Rev. 1.0 16/ 19
desired geographical area of operation, and the FCC ID number and other
nomenclature of the UWB device. This material shall be submitted to the following
address:
Frequency Coordination Branch., OET
Federal Communications Commission
445 12th Street, SW
Washington, D.C. 20554
ATTN: UWB Coordination
(c) The manufacturers, or their authorized sales agents, must inform purchasers
and users of their systems of the requirement to undertake detailed coordination
of operational areas with the FCC prior to the equipment being operated.
(d) Users of authorized, coordinated UWB systems may transfer them to other
qualified users and to different locations upon coordination of change of ownership
or location to the FCC and coordination with existing authorized operations.
(e) The NTIA/FCC coordination report shall include any needed constraints that
apply to day-to-day operations. Such constraints could specify prohibited areas of
operations or areas located near authorized radio stations for which additional
coordination is required before operation of the UWB equipment. If additional local
coordination is required, a local coordination contact will be provided.
(f) The coordination of routine UWB operations shall not take longer than 15
business days from the receipt of the coordination request by NTIA. Special
temporary operations may be handled with an expedited turn-around time when
circumstances warrant. The operation of UWB systems in emergency situations
involving the safety of life or property may occur without coordination provided a
notification procedure, similar to that contained in CFR47 Section 2.405(a)-(e), is
followed by the UWB equipment user.
Notice
This device devices may not be employed for the operation of toys. Operation
onboard an aircraft, a ship or a satellite is prohibited.