User's Manual

i-PORT F310
Page 13 of 17
4 Initial Operation
4.1 Checking the Installation
After completing the installation the operation must be systematically checked.
The installation check can be divided into three sections:
Visual test
Basic operational check
Detailed operational check
If the basic check of the operational behavior is to be carried out using a (portable) PC a final check
via the intended user control system should also be carried out.
4.2 Configuration
4.2.1 Tools Needed
4.3 Configuration of the Ethernet Interface
Tools needed
PC with working Ethernet NIC running MS Windows for configuration software
Software “Device Discovery Utility”
Crossover Ethernet cable
Power supply (24 VDC) for the i-PORT
Network settings from your network administrator
Prepare the PC
Disconnect the PC from the network
Set the Ethernet connection of the PC to DHCP (described below)
Switch off the proxy settings of the standard web browser
After finishing the configuration of all i-PORTs restore the previous settings of the PC.