User's Manual
Table Of Contents
i-PORT M 350, i-SAT 300 RTLS, i-PORT M 350 RTLS
Page 27 of 30
5 Maintenance
5.1 General
In principle, the ILR system is maintenance-free. When correctly installed it operates for many years
without any problems.
5.2 Precautionary Maintenance
Regular checking of all ports and cables belonging to the system is recommended. Unstable
connections could lead to damage and malfunctions of the system and therefore should be repaired
as soon as possible.
A Brief Checklist
• Are all casing intact?
• Are all cables intact?
• Are all connectors intact?
• Are all connectors securely fastened?
• Are all screws still tight?
• Is there suddenly a malfunction at a specific unit?