User's Manual

RTLS Hardware and Installation Manual
Page 16 of 30
4 Initial Operation
4.1 Checking the Installation
After completing the installation the operation must be systematically checked.
The installation check can be divided into three sections:
Visual test
Basic operational check
Detailed operational check
If the basic check of the operational behavior is to be carried out using a (portable) PC a final check
via the intended user control system should also be carried out.
4.2 Configuration
4.2.1 Tools Needed
Standard-PC running Microsoft Windows
RS422 Interface (USB to RS422 converter, order code 292 771)
9 pin D type to RJ45 adaptor with power supply plug (order code 348 369)
Power Supply Plug (24 VDC, 30 W, order code 367 976)
1:1 fully wired RJ45 Patch-Cable, length: 2 m (order code 696 627)
Configuration Tool “ILR Config” with RTLS plug-in