Full Product Manual

iDEAL Paint Mixing Room (PSB-PMR1088-AK)
12
9. Following exploded view drawings, continue alternately assembling wall panels and roof panels to each other
until you reach front end of booth.
10. Verify walls are plumb and booth is square and on floor layout marks. Tighten all mounting hardware.
11. Anchor floor channels to floor at a minimum of every 12 inches.
12. Caulk all panel joints inside the booth with the acrylic latex caulk provided. Do not use a silicone caulk.
13. Apply 3/8 foam gasket seals to perimeter of door frame opening.
PERSONNEL DOOR
4.4.1 DOOR HANDLE & LATCH INSTALLATION
1. Using the #12 Drill/Drive Screws connect Handles to front & back of Door, approx. 42 from bottom of Door.
2. Remove 2ea bolts and insert Door Latch Bracket (CF-28) into upper Filler Door Panel (#4) with the Latch
Brackets bolt plate facing upwards. Reinsert bolts & tighten.
3. Use #14 drill screws to connect Door Latches to Door & Latch Bracket, ensuring the alignment and spacing is
correct.
4.5 LIGHT FIXTURES