Instructions / Assembly
iDEAL Paint Spray Booth (PSB-SDD26B-AK)
34
5.3 EVERY TWO MONTHS
5.3.1 Lubricate Door Latches
Lubricate bearing pin and laminated cam with SAE 30-50 high temperature oil. Tighten set screws in handle as needed.
For use in cold areas, use SAE 10-20 high temperature oil.
Test explosion-venting feature to verify proper operation. Corrosion and/or build-up of foreign materials may affect
proper operation of latches.
5.4 EVERY SIX MONTHS
5.4.1 Check Fan Belts
1. The fan sheave (A) and motor sheave (B) must be
inaxial alignment. Shafts must be parallel in both
vertical and horizontal planes.
2. The sheaves must be in radial alignment. When
sheaves are of equal width, align with a straight edge
(C). When sheaves are of unequal width, align
centerof sheaves.
3. Check fan belts for proper tension and for signs of
wear. Belt should have a slight sag at bottom
ofsheaves. Belt (D) is properly adjusted. Belt (E) is too
loose. Belt (F) is too tight.
5.5 EVERY YEAR
5.5.1 Inspect Motor
Verify that cooling air to motor has not been diverted or
blocked by dirty guards or other obstacles.
5.5.2 Inspect Fan Wheel
Inspect fan wheel for buildup of material, which may cause an
unbalanced fan wheel. An unbalance fan wheelmay lead to
premature failure of the fan wheel, bearings, and belt. Clean
material buildup as necessary.
5.5.3 Inspect And Clean Air Solenoid Valve
The function of this valve is to interrupt the supply of compressed air to the painting equipment when the booth is not
operating as designed or if any booth doors are open.
The time between cleanings varies depending on the medium and service conditions. If voltage to coil is correct, sluggish
valve operation, excessive noise or leakage indicates that cleaning is required. Close strainer or filter when cleaning
valve. Thoroughly clean all parts. If parts are worn or damaged, install a complete rebuild kit. Follow instructions
included with rebuild kit.