Instructions / Assembly

iDEAL Paint Spray Booth (PSB-SDD26B-AK)
11
NOTE: Refer to exploded view drawings included with your spray booth for installation details.
Basic Installation - First Section:
1. Determine where booth will be constructed (determine where exhaust stacks will exit through the roof) and
where man door(s) will be placed.
2. Use chalk lines to place booth layout on the floor.
3. Starting with rear or front wall panels at either rear corner, bolt one corner panel & one rear wall corner panel
together on chalk lines.
4. Bolt opposite rear or front sidewall panel to rear wall panel on chalk lines.
5. Bolt all rear or front wall panels in place along with their wall panels.
6. Install the hip support angles (if applies) on the right and left frontal back wall panels.
7. Following exploded view drawings, continue assembling wall panels to each other and to the wall panel beam
supports (T-Bars) for the first section of booth.
8. Install the ceiling blank cross support panel between the two wall panel beam hip beams.
9. Install the two hip panels (be sure intake air flat tab is at top of panel).
10. Verify walls are plumb and section is square and on floor layout marks.
11. Install filter grid spacer panels.
12. Square and level all panels shimming from the bottom of the panels. Be sure all joints are plumb and corners
square. Tighten all bolts and nuts as panels are squared and leveled.
13. Anchor panels to floor.
14. Note: If using intake plenum/canopy box, install intake box back panel on top of back wall panel bolting the two
side panels to the back panel.Install three roof panels on top of the intake plenum/canopy boxback and wall
panels.
(See Assembly Detailed Diagrams for details)