Installation Guide

iDEAL Paint Spray Booth (PSB-AFCF23ASY)
22
Installation of Door Sweeps – (Front Doors only)
1. Cut a piece of rubber sweep material long enough to fit the bottom width of the product door.
2. Place cut piece of rubber on the floor centered under the bottom of the door.
3. Lift the outside edges of the cut rubber up on each side of door so it forms a loop that touches the floor.
4. Mark the position of the top edge of the cut rubber on each side of the door.
5. Hold one edge of the cut rubber on the mark on one side of the door and secure with Door Sweep
Bracket Strips (CF01-A00) for each side to hold in place. Secure the Bracket Strips and rubber to the
door using #12 drill screws.
6. Repeat above on the other door.
Installation of Side Door
1. Ensure Side Door Frame (CF-19K) is installed properly, prior to installing Side Door.
(NOTE: Side Door Frame can be installed with Door opening on either side by rotating Frame.)
2. Install Side Door (CF-19M) to Frame using the provided hinge pins.